Everything between the plot and the keys
Eleven services from one team. Order a single drawing or hand us the whole project — the architects, engineers and site team all work from the same set of plans.
- houses designed
- 1,200+
- houses designed
- districts served
- 64
- districts served
- review rounds included
- 2
- review rounds included

All services
Stage 1 of 3
Know your land
Before a single line is drawn, we measure, test and check what your plot can carry.

Digital Survey
Total-station survey of boundaries, levels and road access.
- Price
- From ৳8,000
- Timeline
- 1 day on site, report in 3 days

Soil Test
Bore-hole testing so foundations are designed for real ground.
- Price
- From ৳25,000
- Timeline
- 1–2 days drilling, lab report in 7 days

Site Visit
An engineer walks your land and neighbourhood with you.
- Price
- From ৳3,000
- Timeline
- 2 hours on site
Stage 2 of 3
Design the house
One team for every drawing, so architecture, structure and services agree with each other.

Architectural Design
Plans, elevations, sections and 3D views of your home.
- Price
- From ৳15,000
- Timeline
- 3–5 weeks for a typical 3-floor house

Structural Design
Foundation, column and slab design checked to BNBC.
- Price
- From ৳12,000
- Timeline
- 2–3 weeks after architectural drawings

Electrical Design
Load calculation, wiring layout and fixture plans.
- Price
- From ৳6,000
- Timeline
- 1–2 weeks

Sanitary Design
Water supply, drainage and septic layouts.
- Price
- From ৳6,000
- Timeline
- 1–2 weeks

Interior Design
Layouts, materials and lighting for the rooms you live in.
- Price
- From ৳30,000
- Timeline
- 3–6 weeks
Stage 3 of 3
Get it approved and built
Paperwork, quantities and a site team — the parts that decide whether a project runs on time.

Approval Drawing
RAJUK and local-authority submission sets.
- Price
- From ৳20,000
- Timeline
- 2 weeks to prepare, authority time varies

BOQ
Bill of quantities so you can compare builder quotes line by line.
- Price
- From ৳10,000
- Timeline
- 1–2 weeks

Construction
Full build with weekly progress reports and fixed milestones.
- Price
- Quoted per project
- Timeline
- 10–18 months for a 3–5 storey house
Or choose a package
Packages bundle the services most houses need, for less than ordering them one by one.
Essential
Everything you need to start building.
৳35,000
for a 3-floor house
- Architectural design
- Structural design
- Electrical and sanitary layouts
- Two review rounds
Complete
Most chosenThe package most families choose.
৳65,000
for a 3-floor house
- Everything in Essential
- Digital survey and soil test
- Approval drawings
- BOQ with current rates
- 3D walk-through
Design + Build
One team from the first sketch to the keys.
Custom
quoted per project
- Everything in Complete
- Construction to a fixed price
- Site engineer on every project
- Weekly photo reports
How working with us goes
- 1
Call or message
Tell us what you need. We reply within one working day.
- 2
Brief and quote
A clear scope, timeline and fixed price in writing.
- 3
Work begins
One project lead keeps you updated every week.
- 4
Review together
Drawings are explained, not just emailed.
- 5
Handover
Final files in CAD and PDF, and help whenever your builder has questions.
Common questions
Yes. Every service can be ordered on its own. Packages simply cost less than ordering the same services separately.
